Lesotho – Maseru Mazenod Reservoir Pipelines and Villages – John Hogg World Bank

Water Projects,Lesotho.
Mazenod on the outskirts of Maseru and close to the airport has a 1Mega Litre resevoir under construction. The reservoir is to supply the Mazenod area with 18 km of already laid pipes and 6.8 km of supply line ( still to be connected). Currently behind schedule with progress hampered by bad weather.
The reservoir will also supply the airports pump for their reservoir. The project is overseen by Geoffrey Hilly, from Tanzania), a contractor with Consulting Engineering Centre.

Photograph : John Hogg